How to get a client to approve a video edit
Why round four happens
Almost every stalled approval comes down to the same few things, and none of them is craft. Notes arrive from three people who disagree with each other, so you split the difference and satisfy none of them. The notes themselves are feelings rather than instructions: “it feels long in the middle” sends you guessing, and a wrong guess is a whole round.
Underneath both is usually the same omission. Nothing ever said how many rounds there were, so there are infinitely many, and each one feels free to the person asking for it. And nobody was ever asked to approve anything, so the edit does not end. It only goes quiet.
The process that ends them
Write down what a round is, before you start
Not just how many, but what one is. The wording that does the work: “Two rounds of revisions are included. A round is one consolidated set of notes, delivered in one message, from one named contact. Additional rounds are billed at [rate] per hour, or [amount] per round.”
This is not about being strict. It is so that when round three arrives you are quoting a line you both already agreed to, rather than inventing a boundary in the moment, which is much harder and reads as a complaint.
Make them name one decision-maker
Ask at kickoff: who has final sign-off, and who is consolidating everyone else’s notes before they reach you? Ideally the same person. Clients never object to the question, and it removes the contradictory-feedback problem before it exists.
Send the cut with a specific ask and a date
A link on its own gets opened last. Say what changed, what you need, and when you need it by.
Sending a review cut Subject: [Project] v2 for review — notes by Thu 25th please Hi [Name], v2 is here: [link] Changes from v1: tightened the open by 8 seconds, new music bed from 00:40, swapped the interview take at 01:12 as discussed. Could you leave notes directly on the video — click the moment you mean and type. If you can get them to me by Thursday the 25th, delivery stays on the 2nd. One thing to flag: this is round 2 of the 2 included, so if there is anything structural, now is the moment. Thanks, [You]
Make the notes land on the frame, then answer every one
This is the single biggest reduction in rounds available to you, and it costs nothing to set up. A note attached to 01:14 cannot be misread; a paragraph about the middle bit is a guess with your evening attached to it. If your client insists on email, do the translation yourself: reply with a numbered list of timecoded items and ask them to confirm it before you touch the timeline.
Then go back through the list and mark each one done, done differently, or not done and why. A client who sees their note addressed stops repeating it, and nothing guarantees another round like a note that appears to have been ignored.
Ask for the approval explicitly
Do not wait for it to happen. Ask a closed question, name the version, and put a date on the silence.
Asking for sign-off Subject: [Project] v3 — approve for delivery? Hi [Name], v3 is up: [link] All eight notes from round 2 are addressed — you can see my replies against each one. If you are happy, reply "approved" to this email and I will prepare the final deliverables. If I have not heard back by Friday the 3rd I will take v3 as approved and start delivery, so nothing slips. Thanks, [You]
When the change arrives after sign-off
It will, and it is not an insult. The answer is not no. It is a price and a date, offered warmly enough that saying yes is easy.
Happy to do that — it is outside the approved cut so it falls under additional work rather than the included rounds. It is about 2 hours: [amount], delivered by Wednesday. Say the word and I will get started.
Keep a record of what was approved
Not for a dispute. For the ordinary conversation six weeks later, when someone new joins the client’s team and asks why the edit is like that. Three things are worth being able to show: which version was approved, by whom, and when. An email reply saying “approved” on a thread naming v3 does it. A verbal yes on a call does not, and neither does a general sense that the client seemed happy.
Where a review portal actually helps
In three specific places, and the rest of this is process rather than software. The note lands on the frame, because your client clicks the moment they mean and types, with no account and no app in the way. That last part is what makes a non-technical client actually do it instead of writing a paragraph.
Everyone’s notes then arrive in one thread against one version, visible to each other, which solves half of the consolidation problem by geometry rather than by asking. And the history is kept for you: versions stack on the same project with their comment threads attached, so “what did we agree on v2” has an answer you do not have to reconstruct from your inbox.
When the approval lands, the invoice is on the same page, which is the next problem.
Common questions
How many revision rounds should a video project include?
Two is the common default for a single deliverable, and it works as long as you define what a round is: one consolidated set of notes, delivered in one go, from one person. Three is normal for longer-form or multi-stakeholder work. The number matters much less than writing it down before you start, and stating what happens after it runs out.
What counts as a revision versus a new job?
A revision refines what was agreed: trims, timing, colour, music level, a different take from footage you already have. A new job changes what was agreed: a new cutdown, a different aspect ratio, a re-shoot, a new script, or a structural rethink after the structure was signed off. Say which one you think it is, quote for it, and let the client choose.
What if the client just goes quiet?
Assume it is workload rather than displeasure, and make the next step tiny. Send one short message with a date attached: "If I do not hear back by Friday I will treat v3 as approved and move to delivery." That gives a busy client a way to say yes by doing nothing, and it turns an indefinite wait into a date.
Do I need written approval, or is a thumbs-up enough?
You need something dated that names the version. A reply saying "approved" on the version 3 email is enough; a thumbs-up on a message about something else is not. The point is not formality. It is that in three weeks, when someone asks for a change, you can both see what was agreed and when.
Put your next cut somewhere they can point at it